Saturday, August 15, 2009

All kinds of things

I spent the last week at a facility overseeing the RCRA closure of some old wastewater tanks. It being August in Northern Alabama, it was FLESH-MELTING HOT, so we were starting at 6 AM. The job we thought would only take two days ended up taking four and a half, but it's finally done. And I'm pooped.

Last Wednesday, Micah officially transitioned up the toddler level at his daycare. This means taking a nap on a cot instead of in his crib, a set schedule that includes time on the playground and in the gym, and (Micah's favorite part) TWO snack times per day. They play with playdough, finger paint, sing songs, and learn sign language. He's required to have shoes for wearing outside and sippy cups instead of bottles. He's exhausted every day when he gets home, is eating everything in sight, and is having a BLAST.

I was pretty apprehensive about him moving up, but I think it's been awesome for him. It's a little difficult for me - no more going over to nurse at lunch, because that's right smack in the middle of nap time - but being so busy all week helped distract me. The few times I've stopped by, he's been so involved in playing, he didn't even notice I was there until I sat down in front of him. He's rapidly leaving the baby phase behind, but I'm happy to see him having so much fun.

Bbbtttthpppt

Last Thursday, after several weeks of weighing alternatives, looking at houses, and generally freaking out a bit (at least on my part), we signed a contract to have a house built. You can see the proposed floorplan here. Assuming everything goes as planned, we'll be moving in March. And that means we'll need to put this house on the market sooner rather than later. Now if you need me, I'll be hyperventilating into this paper bag.

Update: Whoops, wrong floorplan link. It's fixed now.

No comments:

Post a Comment